A unique project that used the synergies between the two technology leaders, SAP and EMC. Large data streams, high number of simultaneous users, outdated hardware resulting in high number of critical information system incidents, slowdown in information system work, and downtime risks were the challenges faced by the organization. It was the first converged IT infrastructure installed in the Baltic States (i.e., a set of hardware equipment integrated and tested by the manufacturer itself, including server stations, data storage, network equipment and management software) that was optimized for SAP software solutions already used in the organizatiom. This customized solution of the hardware manufacturer and the development of the technical equipment according to the client’s needs made it possible to transfer the critical information systems of the organization into the new infrastructure within a maximum of six weeks without disturbing its’ operation.



Client

Industry

Solution

Project period

2014-2015

Technology

SAP ERP, EMC VCE VBLOCK